Risk Assessment / JSA
تقييم المخاطر / تحليل سلامة الوظيفة
DOC: VAA-HSE-RA-001 · REV 1.0 · GI 6.029 / NEBOSH
SAFETY FIRST — NO WORK BEGINS WITHOUT APPROVED RISK ASSESSMENT السلامة أولاً — لا عمل يبدأ دون تقييم مخاطر معتمد
Project / المشروع
_________________________
PO Number / رقم أمر الشراء
_________________________
Client / العميل
_________________________
Activity / النشاط
PIR / PUR Insulation Installation
Location / الموقع
_________________________
Date / التاريخ
_________________________
Assessor / المُقيِّم
_________________________
Approver (HSE Mgr) / المعتمد
_________________________
Revision / المراجعة
1.0 / Initial
5 × 5 RISK MATRIX & SCORING LEGEND مصفوفة المخاطر ٥×٥ والتصنيف
Severity × Likelihood = Score
Severity ↓ / Likelihood → 1 Rare2 Unlikely3 Possible4 Likely5 Almost
5 Catastrophic 510152025
4 Major 48121620
3 Moderate 3691215
2 Minor 246810
1 Negligible 12345
Risk Level / مستوى الخطر
1 – 5 LOW · Acceptable · Routine controls
منخفض · مقبول
6 – 10 MEDIUM · Additional controls advised
متوسط · ضوابط إضافية
11 – 15 HIGH · PTW required · Supervisor sign-off
عالي · تصريح عمل مطلوب
16 – 25 CRITICAL · Stop work · HSE Mgr approval
حرج · إيقاف العمل
Hierarchy of controls: Elimination → Substitution → Engineering → Administrative → PPE
HAZARD REGISTER — PIR / PUR INSULATION WORKS (PART 1 of 2) سجل المخاطر — أعمال العزل (ج ١ / ٢)
# Activity Step Hazard S L Score Control Measures S L Res Required PPE Resp.
01 Scaffolding access & erection Fall from height >1.8m, dropped objects, scaffold collapse 54 20 Scafftag green tag inspection daily · trained scaffolders only · 100% tie-off >1.8m · toe-boards · drop zones barricaded · max load notice · wind >32 km/h stop work 51 5 Full-body harness · double lanyard · hard hat with chin strap · safety boots Site Supv · Scafftag Inspector
02 Manual handling of insulation panels / pipe sections Musculoskeletal injury, back strain, crushed fingers 34 12 Two-person lift >23 kg · mechanical aids for panels >1m² · TBT on lifting technique · rotate task every 2 hrs · pre-task warm-up 22 4 Cut-resistant gloves Lv 3 · safety boots Foreman
03 Cutting PIR/PUR with hot knife or hand saw Sharp edge laceration, hot-knife burn, dust inhalation 34 12 Hot-knife guards in place · cut away from body · sharpened blades only · LEV / dust extraction at source · pre-use tool inspection 22 4 Cut-resist gloves Lv 5 · FFP3 mask · safety goggles Insulator · QC
04 Application of adhesives & PUR foam (spray/pour) Vapor inhalation (MDI/Isocyanate), skin sensitization, fire 44 16 SDS on site · forced ventilation 6 ACH min · isocyanate medical surveillance · no smoking 15m radius · fire extinguisher within 10m · skin contact = wash immediately 31 3 Air-fed respirator / APF 40 · chemical gloves nitrile · Tyvek suit · face shield HSE Officer
05 Hot pipe contact during in-service insulation Thermal burn from pipe surface >60 °C, steam release 43 12 Verify line de-pressurized OR confirm operating temp · LOTO if isolation possible · thermal barrier cloth · heat-resistant gloves to elbow · IR thermometer pre-touch check 31 3 Heat-resist gloves to 350 °C · FR coverall · face shield Supv · Operator
06 Welding / cladding fabrication on-site Arc UV exposure, weld spatter burns, fume inhalation, fire 43 12 Hot work permit · fire watch +30 min after · welding screens · LEV on fume · combustibles >10m or covered · gas test before strike 31 3 Welding helmet shade 11 · leather apron · welding gloves · FR coverall Welder · Fire Watch
07 Electrical tools & site power use Electrocution, short circuit, fire, ground fault 53 15 RCD/GFCI on every circuit · 110V site transformer · monthly PAT test color tag · cable elevation >2m or armored · LOTO before live work · no tools in rain 41 4 Class 0 electrical gloves · dielectric boots · ARC flash visor (live work) Electrician · HSE
Vinn Al Azl
VINN AL AZL
فَنّ العَزْل · Saudi-Korean Insulation
Risk Assessment / JSA
تقييم المخاطر / تحليل سلامة الوظيفة
DOC: VAA-HSE-RA-001 · REV 1.0 · CONTINUED
HAZARD REGISTER — PIR / PUR INSULATION WORKS (PART 2 of 2) سجل المخاطر — أعمال العزل (ج ٢ / ٢)
# Activity Step Hazard S L Score Control Measures S L Res Required PPE Resp.
08 Confined space entry (vessels, tanks, ducts) Asphyxiation, toxic gas, engulfment, entrapment 53 15 Confined space PTW · 4-gas test pre-entry & continuous (O₂ 19.5-23.5%, LEL <10%, H₂S <10ppm, CO <25ppm) · attendant outside · tripod & retrieval winch · 2-way radio · rescue plan 51 5 SCBA or SAR · full body harness · hard hat · radio · gas monitor CS Attendant · HSE Mgr
09 Working at heights >1.8m (cold-box top, tank cladding) Fall from edge, falling tools, ladder slip 53 15 Working at heights PTW · edge protection guardrails 1m · double lanyard 100% tied-off · tool tethers · ladder 4:1 angle · drop zones cordoned · weather check 41 4 Full-body harness · double lanyard with shock absorber · helmet chinstrap Site Supv · Rescue Team
10 Heat stress — outdoor Dammam summer (May-Sept) Heat exhaustion, heat stroke, dehydration, WBGT >32 °C 44 16 WBGT monitoring hourly · ML-MOH summer ban 12:00-15:00 Jun-Sept enforced · cool zones with AC · electrolyte water 1L/hr · buddy system · acclimatization 7 days · stop work at WBGT 32 °C 32 6 Cooling vest · wide-brim hard hat · breathable FR coverall · UV sunglasses HSE Officer · Foreman
11 Noise exposure — grinders, generators, plant Hearing loss, communication failure (>85 dB(A)) 34 12 Noise survey on entry · barriers around plant · job rotation · double hearing protection >95 dB · annual audiometry · hearing protection zones signed 22 4 Ear plugs SNR 30 + ear muffs SNR 28 (>95dB zones) HSE · Industrial Hygienist
12 Mineral wool / glass-fiber handling Skin irritation, respiratory irritation, eye irritation 24 8 Dampen material before cutting · LEV at source · disposable coveralls · wash skin pre-break · changing room · no lunch in work clothes 22 4 FFP3 mask · goggles · disposable Tyvek · nitrile gloves Insulator · HSE
13 Chemical storage & spill (solvents, adhesives) Skin contact, vapor inhalation, environmental spill, fire 33 9 SDS on display · COSHH register · bunded storage 110% volume · spill kit within 10m · grounded containers · no smoking signs · daily inventory 22 4 Chemical gloves nitrile · splash goggles · apron · respirator if >TLV Store Keeper · HSE
14 Slip / trip / fall on same level Fractures, sprains, head injury, cable trip 24 8 Housekeeping daily · cables elevated 2m or covered · drip trays under tools · wet floor signs · adequate lighting >200 lux · designated walkways painted 22 4 Slip-resistant safety boots S3 SRC Foreman · All Workers
15 Vehicle / mobile plant interaction (crane, forklift) Struck-by, crush, overturn, pedestrian collision 53 15 Banksman with hi-viz · vehicle exclusion zones · reversing alarms & cameras · speed limit 20 km/h · seg. ped/veh routes · licensed operators only · daily pre-use check 51 5 Hi-viz Class 3 vest · helmet · safety boots Banksman · Operator
16 Hot work — grinding / cutting near hydrocarbons Fire, explosion, ignition of vapor, burns 53 15 Hot work PTW · gas test continuous (LEL <5%) · fire watch 30min after · 10m clearance · fire blankets · 2x 9kg DCP extinguishers · combustibles removed/covered 51 5 FR coverall · welding helmet · leather gloves · face shield Hot Work Supv · Fire Watch
17 Cold work — cryogenic line insulation (LNG / LIN) Cryogenic burn, frostbite, brittle fracture, O₂ enrichment 43 12 Cryogenic gloves to elbow · cryo apron · O₂ monitor (19.5-23.5%) · no exposed skin · ventilated area · emergency shower & eyewash <10s · buddy system 31 3 Cryo gloves · cryo apron · face shield · FR coverall · O₂ monitor Cryo Supv · HSE Mgr
18 Lifting operations — overhead lifts of insulated sections Load drop, sling failure, struck-by load, swing collision 52 10 Lifting plan signed · certified rigger & banksman · tagged slings within 12-month inspection · tag lines · exclusion zone radius +20% · wind <32 km/h · TBT pre-lift 51 5 Helmet chinstrap · hi-viz · gloves · safety boots Lifting Supv · Rigger
HIGH-RISK ACTIVITIES — MANDATORY PERMIT-TO-WORK · أنشطة عالية الخطورة — تصريح عمل إلزامي
Vinn Al Azl
VINN AL AZL
فَنّ العَزْل · Saudi-Korean Insulation
Risk Assessment / JSA
تقييم المخاطر / تحليل سلامة الوظيفة
DOC: VAA-HSE-RA-001 · REV 1.0 · APPROVAL
EMERGENCY RESPONSE SUMMARY ملخص الاستجابة للطوارئ
Site Muster Point / نقطة التجمع
_______________________
Nearest Hospital / المستشفى
_______________________
HSE Emergency Line / خط الطوارئ
+966 ___ ___ ____
National Emergency / الطوارئ الوطنية
911 / 997
Site Supervisor / مشرف الموقع
_______________________
HSE Officer / مسؤول السلامة
_______________________
Client Rep / ممثل العميل
_______________________
First Aider / المسعف
_______________________
RA REVIEW & APPROVAL — SIGNATURES مراجعة واعتماد تقييم المخاطر
Prepared By / أعدّ بواسطة
Name: _______________________________
Title: Risk Assessor / NEBOSH IGC
Iqama #: _____________________________
Date: ________________________________
Signature / التوقيع
Reviewed By / روجِع بواسطة
Name: _______________________________
Title: Site Supervisor
Iqama #: _____________________________
Date: ________________________________
Signature / التوقيع
Approved By — HSE Manager / اعتمد بواسطة — مدير السلامة
Name: _______________________________
Certification: NEBOSH IDip / OSHA 30
Iqama #: _____________________________
Date: ________________________________
Approval Status:   Approved   /   Approved with conditions   /   Rejected
Conditions / Comments:
Signature & Company Stamp / التوقيع وختم الشركة
RA COMMUNICATION REGISTER — WORKER ACKNOWLEDGMENT سجل تبليغ تقييم المخاطر — إقرار العمال
# Name / الاسم Iqama # / رقم الإقامة Role / الدور Signature / التوقيع
1
2
3
4
5
6
7
8
9
10
STOP WORK AUTHORITY — EVERY WORKER · EVERY DAY · NO REPRISAL صلاحية إيقاف العمل — لكل عامل · كل يوم · دون عواقب